Bid Tabulation Attached.
Addendum 2 issued 2/9/2023.
Addendum 1 issued 2/3/2023.
Contractor to provide and install a skid-based Air Gap pump system and tank at the Wastewater Treatment Plant that meets water protection requirements per Washington Department of Health regulations 246-290-490 WAC (Washington Administrative Code).
The engineers estimate for this work is $95,000 - $120,000.